Redwood High School

Introduction to Redwood High School's Current Proposed Projects

During the 2021-22 school year, the district completed a 10-month Facilities Master Plan (FMP) process, in which more than 775 stakeholders identified and prioritized projects that satisfied the mission and vision of the District. Stakeholders included students, staff, district leadership, parent and community members, and neighboring cities and towns where potential projects might have an impact. While many projects were identified as high priority at all school sites, the following are the critical, urgent projects at Redwood that are being proposed as part of the TUHSD bond (Measure B) on the November 2024 ballot.

Project Breakdown

Proposed Projects

  • Classroom Building Replacements
    & Multi-Purpose Eating Area
    Arts - $18.6M, Music - $27.4M, MPEA- $15.1M, Site/Demo/Temp Port - $11.0M
    $72.1m
  • Roofs / HVAC Replacement $22m
  • Information Technology Modernization $1.5m
  • Ghilotti Field Turf Replacement $1.1m
  • Kitchen & Serving Space Modernization $1m
  • Track Resurfacing $.5m
  • Pool Replastering $.4m
  • Program Contingency $4.1m
  • Bond Issuance $.3m
  • Administrative Costs $.3m

Total Funding

$103.3m

Redwood Site Plan

Current

Proposed

Proposed Redwood HS Fine Arts, Student Commons & Dining (FASCD) Building Replacement Project

FASCD Building Replacement Project – includes construction of new Arts and Music buildings to replace existing aged art and music classroom portables, and construction of a new Multi-Purpose Eating Area (MPEA) building to expand student dining. This project also modernizes the existing kitchen and food service area. The new Arts building includes dedicated ceramics and art classrooms, outdoor workspaces, student bathrooms and storage.  The new Music building includes a large and a medium ensemble room, instrument storage, recording studio with practice rooms, music library, office and lobby space.  The MPEA includes a 3,500 square foot flexible space for student dining, meetings, events, etc. as well as student bathrooms, storage and utility spaces.  All three new buildings are connected with a covered walkway that helps integrate these new facilities with the existing two-story art classroom building with many gathering and seating areas dispersed throughout.

Tell us what you think about Redwood's proposed projects.