Archie Williams

Introduction to Archie Williams' Current Proposed Projects

During the 2021-22 school year, the district completed a 10-month Facilities Master Plan (FMP) process, in which more than 775 stakeholders identified and prioritized projects that satisfied the mission and vision of the District. Stakeholders included students, staff, district leadership, parent and community members, and neighboring cities and towns where potential projects might have an impact. While many projects were identified as high priority at all school sites, the following are the critical, urgent projects at Archie Williams that are being proposed as part of the TUHSD bond (Measure B) on the November 2024 ballot.

Project Breakdown

Proposed Projects

  • Roofs / HVAC Replacement $27.4m
  • Performing Arts Center Modernization
    (music/drama classrooms & theater)
    $11.3m
  • New Outdoor Areas & Portables Demo $7.9m
  • Baseball Field Replacement $2.4m
  • Football Field Replacement $2.4m
  • Athletic Fieldhouse Modernization $1.7m
  • Information Technology Modernization $1.5m
  • Track Resurfacing $.5m
  • Storage Replacement $.5m
  • Program Contingency $4.1m
  • Bond Issuance $.3m
  • Administrative Costs $.3m

Total Funding

$60.3m

Note: Estimated costs based on current scope, market conditions, building codes and historical cost escalation trends. Actual costs will be determined by future competitive bidding.

AW Site Plan

Current

Proposed

Proposed Archie Williams HS Performing Arts Center (PAC) Project

Modernize Performing Arts and Music building – includes required American with Disabilities Act (ADA) upgrades in theater/control booth/stage area/restrooms, expanded control booth space with updated lights/equipment, roof replacement and a new Heating/Ventilation/Air-Conditioning (HVAC) system. It also includes new flooring/lighting/paint for the building interior, IT infrastructure upgrades, enhanced music/drama classrooms with sound-proofing, expanded theater lobby/outdoor court area, updated building front to the music department, expanded parking lot, and a modernized campus approach from the corner of Sir Francis Drake Blvd – Saunders Ave.

Proposed Archie Williams HS Athletic Field House Modernization Project

Modernize Field House building – includes complete interior renovation of old large locker room into three dedicated Team Rooms with required American with Disabilities Act (ADA) upgrades, new lockers, storage space, IT infrastructure, LED lighting, student/staff/public bathrooms, equipment room, new flooring and paint. In addition, a new Heating/Ventilation/Air-Conditioning (HVAC) system will be installed, along with a new exterior main entrance and renovation work that includes new exterior paint and water-bottle filling stations. Each Team Room will be utilized by both boys and girls sports teams during the fall, winter and spring sports seasons.

Proposed Archie Williams HS Site Improvements Project

Site Improvements Project – includes improved signage, wayfinding and path/walkway enhancements at various locations on campus for site standardization. Project also includes outdoor classroom/seating areas, gathering areas, natural landscaping and the demolition of six existing condemned portable classroom buildings that are prohibited for student use. This project updates many areas on campus with a rejuvenated aesthetic, expands outdoor student/staff/public seating areas while greatly improving wayfinding/directional signage for the entire site.